All Wrapped Up and No Place to Go—Yet

The wraps are in place: positioned, oriented, taped down.

It’s time to apply the CA—in the morning.

The thrust structure wrap is a bit short, 1½, maybe 2mm. But, it looks like Tim designed things so a fin faring will completely cover the seam.

You must be logged in to post a comment.